Kategoria katika Bilsi
Viwanda
Mgawanyo wa biashara kwa sekta katika Bilsi
| Maelezo ya Viwanda | Idadi ya Uanzishwaji |
|---|---|
| Manunuzi | 153 |
| Hekalu Hindu | 96 |
| Elimu | 95 |
| Duka za vifaa vya elektroniki | 90 |
| Maduka ya vyakula na makubwa | 47 |
| Manunuzi mengineyo | 46 |
| Kahawa migahawa | 45 |
| Maduka ya nguo | 44 |
| Maduka ya dawa na maduka ya madawa ya kulevya | 44 |
| Usafiri | 43 |
Ukweli wa Bilsi
| Area | 519.2 km² |
| Idadi ya Watu | 649,843 |
| Idadi ya Wanaume | 346,016 (53.2%) |
| Idadi ya Wanawake | 303,827 (46.8%) |
| Mabadiliko ya idadi ya watu (1975 to 2020) | +156.5% |
| Mabadiliko ya idadi ya watu (2000 to 2020) | +25.0% |
| Umri Wastani | Miaka 19 (Mwanamume: 18.9, Mwanamke: 19.1) |
| Mitaa | Nagla Agoul, bamba choraha |
| wakati wa Kawaida | |
| Ukanda wa saa | Saa za Wastani za India |
| Latitudo na Longitudo | 28.12941, 78.91090 |
| Posta | 243633 |
Ramani ya Bilsi
Ramani inayoingiliana
Idadi ya watu ya Bilsi
Miaka 1975 hadi 2020
| Data | 1975 | 1990 | 2000 | 2015 | 2020 |
|---|---|---|---|---|---|
| Idadi ya Watu | 253,380 | 429,106 | 519,721 | 609,539 | 649,843 |
| Uzani wa Idadi ya Watu | 488 / km² | 826.5 / km² | 1,001 / km² | 1,174 / km² | 1,251.7 / km² |
Mabadiliko ya idadi ya watu ya Bilsi kutoka 2000 hadi 2015
Ongezeko la 17.3% kutoka mwaka 2000 hadi 2015
| Location | Mabadiliko tangu 1975 | Mabadiliko tangu 1990 | Mabadiliko tangu 2000 |
|---|---|---|---|
| Bilsi | +140.6% | +42% | +17.3% |
| Uttar Pradesh | +134.1% | +59.5% | +28.4% |
| Uhindi | +111.1% | +50.6% | +24.5% |
Umri wa wastani wa Bilsi
Umri wa wastani: miaka 19
| Location | Umri Wastani | Umri wa Kati (Kike) | Umri wa Kati (Mwanaume) |
|---|---|---|---|
| Bilsi | 19 yrs | 19.1 yrs | 18.9 yrs |
| Uttar Pradesh | 21.4 yrs | 21.7 yrs | 21 yrs |
| Uhindi | 24.9 yrs | 25.4 yrs | 24.5 yrs |
Msongamano wa watu wa Bilsi
Msongamano wa watu: 1,252 / km²
| Location | Idadi ya Watu | Area | Msongamano |
|---|---|---|---|
| Bilsi | 649,843 | 519.2 km² | 1,252 / km² |
| Uttar Pradesh | 217.8 million | 240,777.3 km² | 905 / km² |
| Uhindi | 1,307 million | 3,083,563.4 km² | 424 / km² |
Idadi ya watu ya kihistoria na inayokadiriwa ya Bilsi
Idadi ya watu inayokadiriwa kutoka 0 hadi 2100
- JRC (European Commission's Joint Research Centre) kazi ya GHS built-up grid
- CIESIN (Center for International Earth Science Information Network)
- [Kiunga] Klein Goldewijk, K., Beusen, A., Doelman, J., and Stehfest, E.: Anthropogenic land use estimates for the Holocene – HYDE 3.2, Earth Syst. Sci. Data, 9, 927–953, https://doi.org/10.5194/essd-9-927-2017, 2017.
Simu Kiambishi
Nambari za eneo la Asilimia zinazotumiwa na wafanyibiashara katika Bilsi
Posta
Asilimia ya biashara kwa Misimbo ya Posta katika Bilsi
Kielelezo cha Maendeleo ya Binadamu (HDI)
Faharisi ya takwimu ya kitisho cha kuishi, elimu, na mapato ya kila mtu.
Utoaji wa CO2 wa Bilsi
Carbon Dioxide (CO2) Uzalishaji wa hewa kwa Capita huko Tonnes kwa mwaka
| Location | Uzalishaji wa CO2 | Uzalishaji wa CO2 kwa Capita | Uzito wa uzalishaji wa CO2 |
|---|---|---|---|
| Bilsi | 701,050 tn | 1.08 tn | 1,350.3 tons/km² |
| Uttar Pradesh | 259,048,938 tn | 1.19 tn | 1,075.9 tons/km² |
| Uhindi | 1,928,568,344 tn | 1.48 tn | 625.4 tons/km² |
| Utoaji wa CO2 wa 2013 (tani/mwaka) | 701,050 tn |
| Utoaji wa CO2 wa 2013 (tani/mwaka) kwa mtu | 1.08 tn |
| Nguvu ya utoaji wa CO2 wa 2013 (tani/km²/mwaka) | 1,350.3 tons/km² |
Hatari ya Hatari za Asili
Relative risk out of 10
| Hatari | Risk Level |
|---|---|
| Drought | High (8) |
| Flood | High (10) |
| Earthquake | Medium (4) |
* Risk, particularly concerning flood or landslide, may not be for the entire area.
- Dilley, M., R.S. Chen, U. Deichmann, A.L. Lerner-Lam, M. Arnold, J. Agwe, P. Buys, O. Kjekstad, B. Lyon, and G. Yetman. 2005. Natural Disaster Hotspots: A Global Risk Analysis. Washington, D.C.: World Bank. https://doi.org/10.1596/0-8213-5930-4.
- Center for Hazards and Risk Research - CHRR - Columbia University, Center for International Earth Science Information Network - CIESIN - Columbia University, and International Research Institute for Climate and Society - IRI - Columbia University. 2005. Global Drought Hazard Frequency and Distribution. Palisades, NY: NASA Socioeconomic Data and Applications Center (SEDAC). https://doi.org/10.7927/H4VX0DFT.
- Center for Hazards and Risk Research - CHRR - Columbia University, Center for International Earth Science Information Network - CIESIN - Columbia University. 2005. Global Flood Hazard Frequency and Distribution. Palisades, NY: NASA Socioeconomic Data and Applications Center (SEDAC). https://doi.org/10.7927/H4668B3D.
- Center for Hazards and Risk Research - CHRR - Columbia University, Center for International Earth Science Information Network - CIESIN - Columbia University. 2005. Global Earthquake Hazard Distribution - Peak Ground Acceleration. Palisades, NY: NASA Socioeconomic Data and Applications Center (SEDAC). https://doi.org/10.7927/H4BZ63ZS.
Matetemeko ya Ardhi ya hivi karibuni
Uzito 3.0 na zaidi
| Tarehe▼ | Wakati↕ | Magnitude↕ | Distance↕ | Undani↕ | Location↕ | Kiunga |
|---|---|---|---|---|---|---|
| 4/7/04 | 9:02 AM | 4.2 | 94.1 km | 10,000 m | Uttar Pradesh, India | usgs.gov |
| 3/23/99 | 7:29 AM | 3.7 | 78.4 km | 33,000 m | Uttar Pradesh, India | usgs.gov |
| 3/16/99 | 10:27 PM | 4.2 | 79.5 km | 33,000 m | Uttar Pradesh, India | usgs.gov |
| 8/15/66 | 2:15 AM | 5.6 | 48.5 km | 27,000 m | Uttar Pradesh, India | usgs.gov |
Kuhusu Takwimu Zetu
Data katika ukurasa huu inakadiriwa kwa kutumia zana na rasilimali kadhaa zinazopatikana hadharani. Inatolewa bila dhamana, na inaweza kuwa na makosa. Tumia kwa hatari yako mwenyewe.

